IMPS Production Update March 26, 2010

Hey IMPS fans,

So this past week, Dave and I (Nathan) went out to visit Eric in his beautiful chateau in the forest filled mountains to work on more prop and costume parts. The crisp mountain air and higher altitude made for some excellent AB mixing of Polyurethane. While we waited for molds to kick, Eric gave us his ‘dog and pony’ show of the look of new and unexplored Relentless hanger bays for Chapter 4. All I’m going let on is that I feel bad you’re going have to wait to see them, because they are a new level of WOW! The good news is that, very soon, Pete should be handing me a lot of the final FX shots for Chapter 3 and I believe some of the afore mentioned Chapter 4 plates make an appearance at the very end of 3. That means I get to hit high gear with the editing and deliver picture lock to Andy so he can give it the sweet, sweet sounds and score that we all love to hear.

Visiting with Eric was additionally awesome as he monitors way more of the message boards and blogs than we can. He shared a lot of the positive feed back about Chapter 2, which is always inspiring. Thank you all for your patience and enjoying what we’ve striven so hard to get to you.

If you haven’t already – check out and join the I.M.P.S. The Relentless Fan Facebook page started by Chris Walker. He started it without us even knowing and the next thing we all know it’s a great place to visit. Kudos Chris!

Enjoy some pix of our hard work in the mountains.

Thank you all, you rock!
Nathan and the Blacksheep Squad